Integrated Industrial Factory – Kuwait
Efficient execution of an industrial building using Pre-Engineered Building (PEB) systems
Year of Completion: 2025
Location: Saudi Arabia
Area: 18,000 m²
Project Type: Industrial
System: PEB
Project Overview
This industrial project was executed using Pre-Engineered Building (PEB) systems, where the structure was designed to meet operational requirements and achieve maximum space efficiency. The focus was placed on speed of execution and manufacturing quality, while adhering to international engineering standards to ensure durability and sustainability.
Scope of Work
- Structural Design
- Steel Structure Manufacturing
- Supply of Cladding Systems
- Project Execution and Installation
Project Features
- Flexible and Scalable Design
- Flexible and Scalable Design
- Speed of Execution
- High Space Efficiency


